|
|
SPEEDWEEK 2009 DAILY DIARY |
|
|
|
Aug 5 The trailer was repacked and we finished of the final touches on both bikes and with a couple of changes. We had to change a
NOS fitting on Black Thunder as when we pressurised the system we discovered a leak, and despite trying to tighten and reposition the lines, the leak would not go away.
We loaded both bikes in to the trailer and then locked up in anticipation of our big trip tomorrow when we head off to Bonneville.
|
|
|
|
|
|
|